DeskfolioPrint and paper

The flood is the brief

North Wharf was not a branding problem that happened to be outdoors. The water was the job.

The first letter from the pier described a market, a gate, and a Saturday. The second letter, from the harbour master, described the two tides that cover the landward boards. The second letter was the brief. A wayfinding system that cannot be taken down is a system for a different pier.

Most of the drawing happened after the screws were chosen. Brass, four of them, the same driver the harbour already keeps in a tin. If the map had needed a tool that was not in that tin, it would have stayed up through the flood, which is the failure the job was supposed to prevent.

The studio did not go back to watch the spring tide. The test is whether someone who is not the designer can unscrew the board and still want to put it back in the morning.

All notes